DBS logo

Mobilna verzija spletne strani še ni na voljo.

Tesovnikova ulica 88a, Ljubljana, Slovenia
  • en
DBS logo

Another air dome rised up right before winter – this time in Bosnia and Herzegovina

07/12/2020

Right before winter our team successfully installed another air dome sized 36x36x11 m, covering 2 tennis courts, in Bosnia and Herzegovina. The Air dome is made with an energy-saving DBS PLUS membrane system and equipped with energy-efficient LE-DBS lighting technology, which contributes to minimizing energy consumption. One of the main reasons for choosing DBS air domes is also rapid installation and the possibility for easy dismantling of the dome – during summer air domes can be easily dismantled in only one day.

Energy-efficient membrane systems, ultimate LE-DBS lighting technology, and high-effective heating technologies, designed according to client wishes, are only a few reasons, why DBS air domes are the right choice.